Origin Design worked with both the City of Dubuque and various contractors on 11 locations along the Southwest Arterial Corridor.
project overview
The $189-million-dollar arterial is a 6.1-mile, four-lane divided freeway extending between U.S. Highway 61/151 and U.S. Highway 20. The corridor connects the Dubuque Technology Park on U.S. Hwy 61/151 with the new Dubuque Industrial Center West and the existing Dubuque Industrial Center near U.S. Hwy 20.
Origin Design provided construction engineering and land survey services for the projects.